Charging Infrastructure Plan
Strategic deployment plan for charging infrastructure across the network
Infrastructure Requirements
Charging Station Specifications:
- Power Output: 2,000 kW (matching 1C charging rate)
- Grid Connection: Medium voltage (15kV) direct connection
- Charging Interface: Standardized automatic connection system
- Safety Systems: Advanced monitoring and emergency shutdown
Location Priority Matrix
Phase 1 (High Priority):
- Zürich HB:
- 4 charging stations
- 8,000 kW total capacity
- Implementation: Q1-Q2 2024
- Basel SBB:
- 3 charging stations
- 6,000 kW total capacity
- Implementation: Q2-Q3 2024
Implementation Timeline
Phase 1: Major Hubs (2024)
- Zürich HB and Basel SBB installations
- Grid connection upgrades
- Initial testing and optimization
Phase 2: Secondary Locations (2025)
- Olten and Bern installations
- Network expansion
- Operational optimization
Phase 3: Network Completion (2026)
- Remaining location installations
- System-wide integration
- Full operational capability
Grid Integration Strategy
- Power Supply: Direct connection to railway power grid (15kV)
- Peak Management: Smart charging coordination system
- Backup Systems: Emergency power supply for critical operations
- Future Expansion: Modular design for capacity increases
Maintenance and Support
- Regular Maintenance: Quarterly inspections and testing
- Remote Monitoring: 24/7 system status tracking
- Technical Support: On-call emergency response team
- Software Updates: Regular optimization and security updates