Charging Infrastructure Plan

Strategic deployment plan for charging infrastructure across the network

Infrastructure Requirements

Charging Station Specifications:

  • Power Output: 2,000 kW (matching 1C charging rate)
  • Grid Connection: Medium voltage (15kV) direct connection
  • Charging Interface: Standardized automatic connection system
  • Safety Systems: Advanced monitoring and emergency shutdown

Location Priority Matrix

Phase 1 (High Priority):

  • Zürich HB:
    • 4 charging stations
    • 8,000 kW total capacity
    • Implementation: Q1-Q2 2024
  • Basel SBB:
    • 3 charging stations
    • 6,000 kW total capacity
    • Implementation: Q2-Q3 2024

Implementation Timeline

Phase 1: Major Hubs (2024)

  • Zürich HB and Basel SBB installations
  • Grid connection upgrades
  • Initial testing and optimization

Phase 2: Secondary Locations (2025)

  • Olten and Bern installations
  • Network expansion
  • Operational optimization

Phase 3: Network Completion (2026)

  • Remaining location installations
  • System-wide integration
  • Full operational capability

Grid Integration Strategy

  • Power Supply: Direct connection to railway power grid (15kV)
  • Peak Management: Smart charging coordination system
  • Backup Systems: Emergency power supply for critical operations
  • Future Expansion: Modular design for capacity increases

Maintenance and Support

  • Regular Maintenance: Quarterly inspections and testing
  • Remote Monitoring: 24/7 system status tracking
  • Technical Support: On-call emergency response team
  • Software Updates: Regular optimization and security updates